Distribution gas pipeline for resort complex of Borovets Back

Employer: SAMOKOV G 2001 LTD

Designer: Samokovgas LTD

Location: Town of Samokov, resort complex of Borovets

Term under the Contract: 3 months

Term of execution: 3 months

Budget: In conformity with agreed financial parameters.

Excess over the budget: None

Length of the gas pipeline: 7482 l. m.

Description of the activities: Setting-out of the gas pipeline, excavation works and layout of the strip in earth and rock soils, transportation of earth masses and backfilling of the trench with a bulldozer after laying steel pipes ф 219mm with anti-corrosion isolation and a protective band. Transition was made across the Iskar River with reinforced concrete weighing devices. Gamma control of the front welded joints was exercised, verification with a spark flaw detector of the insulating coating and cutting of a control stick for conducting mechanized testing were performed.

Focus: Execution of a technological pipeline in an intensely broken forest ground, making the break-off and assembly works by means of tubing catches.

Execution: Excellent quality without any remarks.

Status of the Project: Permit for commissioning.